Before the sun comes up to ruin my sleep, here’s a short status update:

Here's the Universe as it stands from my perspective:

Load-out started at about 5 pm.  I have been working since then resetting the theater and have arrived home now at about 4 am.

The floor is painted.  It should be fine to walk on at about 8 am, though treat it as kindly as you can.

The cyc is hung but not set or stretched at all yet.  That, along with rebuilding its lighting setup, is on my agenda for Monday.

PTF's window is ours to do with as we wish.  It is dismounted.  Picture enclosed.

My wife's car decided it wants to be a lawn ornament for a while, so right now I have no idea when I will be there Monday, nor for how long.  More info when she and I figure out our day's plan.  But it won't be in the morning, I assure you. :)

Sound and video (rough-in at least) are also on Monday's list.  Physically setting and then programming lights are after we have a set and I've actually seen a run-through.  So probably Tuesday night.

And that's where things stand for me at this moment.  So now I am done standing and shall commence lying down.  With my eyes shut.

Iain Odlin

Iain Odlin is a theatrical polymath. He designs lights. He designs sound. And he is the overall technical guru to our production.

Next
Next

Set and props are in.